CHP Unit Installation at Altunizade Hospital, Turkey

Place of implementation: Acibadem Altunizade Hospital Istanbul, Turkey
CHP unit type
2x TEDOM Quanto 1200
Fuel
Natural Gas
Electrical Output
2 400 kW
Heat Output
2 590 kW
Total Efficiency (LHV)
90.8 %

21st hospital of Acibadem Healthcare Group opened its doors in Altunizade, at the beginning of 2017. Acibadem Altunizade Hospital has many specialized care units along an advanced technical infrastructure, medical technology, professional healthcare personnel in all branches.

As the primary source of heat and power, the hospital procured and installed two QUANTO 1200 containerized CHP from TEDOM which were installed by Arke Enerji company.

The installation had unique challenges and due to space limitations and the CHP’s had to be located on the roof of the hospital which is 55 meters above the ground level. Further complications were caused by the extreme weight of containers on the roof, therefore a customized 500mm steel base with enhanced vibration mounts to reduce noise. These mounts were designed and constructed for the base of the CHP’s which were directly supported from the main load bearing columns of the building.