SERIES OF SUCCESSFULLY COMMISSIONED TEDOM CHP UNITS!
Children’s Clinical Hospital in Warsaw
The first one of the three commissioning procedures took place at the Children’s Hospital in Niekłańska Street, Warsaw, where the Cento 180 CHP unit was installed. Models of this type are ideal for energy-intensive buildings such as this hospital. The CHP unit in this facility includes TEDOM natural gas engine. The CHP unit is located in the building and that is why the sound enclosure version was chosen to reduce the noise level to 78 dB (A) at a distance of 1 m. The entire project was carried out in cooperation with Introl-Energomontaż spol. s r.o., with whom we are also currently working on our largest project at Zakłady Górniczo-Hutnicze “Bolesław” (Mining and Metallurgical Plant “Bolesław”) in Bukowno.
Waste treatment plant in Rybnik
Another commissioning took place at the BEST-EKO waste treatment plant in Rybnik. We commissioned the biogas-powered CENTO 350 CHP unit with a MAN engine there. The project was implemented in cooperation with SJ Construction. This is our first contact with this company, but we hope for further successful cooperation.
Biogas plant in the municipality Dzikowiec
The third commissioning was carried out at the biogas plant in Dzikowiec. The local investor chose the QUANTO 600 model. The CHP units of this type are characterized by a high energy output which is ideal for a site with such a high energy demand. The CHP unit with the MWM engine is powered by biogas produced in the investor’s agricultural biogas plant. Just like the CHP unit in Rybnik, this CHP unit was constructed in the containerized version. The project was implemented in cooperation with PROEKO Artur Ratajczak with whom we have been successfully cooperating on several projects for the last couple of years.